    Usually, a block production line has six stages:

    Stage 1. Raw material batching

    Stage 2. Concrete mixing

    Stage 3. Block making

    Stage 4. Block curing

    Stage 5. Block cubing

    Stage 6. Pallet returning

    Stage 1. Raw material batching Manual

    -handle trolly (about 2 sets), Carry sand, scree, cement etc. To mixer

    Stage 2. Concrete mixing Mechanical

    -concrete mixer Prepare concrete for block making machine

    Stage 3. Block making Auto

    -concrete belt conveyer Carry concrete to storage hopper

    -concrete storage hopper Store concrete for block making machine

    -PX-QT/M block making machine Produce concrete blocks

    -hydraulic station provide strong oil pressure power for actions of block making machine

    -pallet feeder Provide pallet to block making machine

    -block conveyer Carry fresh blocks&pallet out from block making machine

    Stage 4. Block curing Mechanical

    -movable stacker stack fresh blocks&paverlayer by layer from block conveyer

    -hydraulic lift or forklift (about 3 / 2 sets) Carry blocks&pallet to curing area, then to block storage area

    Stage 5. Block cubing Manual

    Stage 6. Pallet returning Mechanical

    -hydraulic lift or forklift carry pallets to pallet feeder

    Control System 1 PLC

    It controls the working conditions of concrete belt conveyor, concrete storage hopper, hydraulic station, block making machine, block conveyer, movable stacker, and pallet feeder.

    Curing Way Natural Curing II

    2 days at curing area, be covered by polythene sheeting under sun treatment, then be moved outside to block storage area for about 10 days before selling

    Workers Needed 8

    2 for aggregates batching and put aggregates into hoisting hopper of mixer; 1 for mixer, water adding in, concrete discharging; 1 for block making, operating the control cabinet; 1 for forklift, moving stacked block&pallets to curing area; 2 for cubing cured blocks together on tray and collect pallets together; 1 for carry cubed blocks to block storage area with forklift, and move pallets to block making machine.

    Total Power and Land Space about 75kw and 5500 square metres totally.