Instalasi Shelter Biogas Bio Elektrik BD 7000L [ Bio Electric Biogas Installation Shelter ]
Presentation of shelter Biogas Bio Electrical Installation BD 7000 L is intended for the corporation ( the main market, hotels, restaurants, factories, housing, apartments, condominiums and industrial estates) who have problems with solid waste and waste management problems in the region or, all those who plan waste ( biomass) business by selling a product output in the form of biogas, electricity and organic fertilizer.
Bio Electrical Installation consists of 3 units of 7000-liter digester capacity, a machine enumerator MPO 500 HD ( Honda) , 3 MP 24150 biogas purification unit ( stainless steel) , gas holder capacity> 10 m3, 3 units of 5000 watt biogas generator ( BG 5000) and equipment installation to the unit stoves and generators.
The economic feasibility of Biogas and Bio Electrical Installation Biophosko BD 7000L-enabled processing waste biomass or organic waste for the first time in 21 m3 ( equivalent to 7 tons) and 4.2 m3 next day or 1.26 tons / day.
Every day, the output shelter Installation produces biogas with a purity> 80% methane ( CH4) as much as 37.8 m3 that has power and high calorie burning stove as the ingredient for the cooking equivalent of 17, 388 kg of LPG, or fuel gas can turn 3 units 5000 watt generator units as many as 45, 36 kWh ( kilo watt hour) . In addition to revenue from sales of fuel gas or electric energy above, the installation of the mud shelters BD 7000L produce quality organic liquid fertilizer as much as 3.78 m 3 / day.
On condition that the project sponsor has the goal of waste management, construction installation chose BD 7000L shelter will have a opporunity cost of waste disposal costs during this run.