PELATIHAN PENGOPERASIAN KUBIKEL 20 KV[Jan. 10, 2011 8:15:17]
Specification
OPERATION CUBICLE 20 KV TRAINING
ANSWERED PROBLEMS
Distribution system reliability, particularly on how the operation of 20 KV cubicle panel is determined by the system operating procedures according to SOP, it is necessary
preparedness resources capable of performing the operation panel 20 KV cubicles properly so that failure can be minimized.
TRAINING BENEFITS
After this training the participants are able to operate 20 KV cubicle panels, stage pengoperaasian cubicle panel of 20 Kv
trouble shooting the problem with the correct operation of the cubicle, according to Standard Competency company PT PLN ( Persero) : DNO ( 3) Network Operations
Distribution / Distribution Network Operation refers to the Personal Competency Standards Department. EMR: DIS. OPS 017 ( 2) . A, DIS. OPS 018 ( 2) . A, DIS. OPS.
020 ( 2) . A, DIS. OPS 021 ( 2) . A, DIS. OPS. 022 ( 2) . A
PARTICIPANTS
• The maintenance or who are prepared to carry out the operation of cubicles 20 KV
REQUIREMENTS PARTICIPANTS
• Have the competence field of Distribution
SCOPE OF REVIEW taught
• In Class Training • On The Job Training
1. Applied Electrical Engineering
2. Measurement and Measurement
3. Introduction cubicle 20 KV and component-komponenya
4. Operation and Trouble Shooting cubicle 20 KV
5. Operation of 20 KV SOP cubicle
6. Operation of 20 KV practice cubicles
1. Prepare operating procedures cubicle 20 KV
2. Carry out the operation cubicle 20 KV
3. Identify and overcome interference cubicle 20 KV operation
4. Create report
DURATION OF TRAINING IMPLEMENTATION
In Class Training: 2 days
On The Job Training: 3 days
CERTIFICATE:
• Training Certificate awarded to participants who have graduated in In Class Training.
• Certificate of Competence is awarded after conducting OJT and declared competent by Udiklat on the recommendation of Mentor.
COOPERATION:
PT PLN ( Persero) Udiklat Pandaan cooperate Polytechnic of Malang